Project Portfolio

COLORADO SPRINGS ORTHOPEDIC GROUP | EXPRESS URGENT CARE

It’s great to be a part of the growth of our clients and especially with Colorado Springs Orthopedic Group. This was our third completed project with them since September 2017 and we are thankful we were provided this opportunity to continue this relationship.

38North was engaged as the General Contractor to provide construction services to renovate a portion of their existing Physical Therapy space into their Express Urgent Care. The space is located on the 1st level of their facility, below the Surgery Center on the 2nd floor. Collaborating closely with CSOG and CBRE (Property Manager), the demolition and disruptive activities were pre-planned and completed off-hours to keep any disruptions to the Surgery Center and existing spaces to a minimum.

Construction began the end of March 2017 with the heavy demolition of walls and installation of the new Samsung GF50 X-Ray unit. Over the 6 week schedule we created a new 3-space M.A. Station, 3 exam spaces, new reception area and new finishes throughout. The project opened on May 7, 2018 and has been a success in the portfolio of Colorado Springs Orthopedic Group.

COLORADO SPRINGS ORTHOPEDIC GROUP | Audubon Orthotics & Prosthetics

38North Construction was selected as the General Contractor for the Colorado Springs Orthopedic Group – Audubon Orthotics and Prosthetics expansion South Campus. The project consisted of the fit out of 2900sf of existing shelled space that included 4 new exam rooms, a gym area for testing and tuning, support spaces and a new orthotic and prosthetic lab. The project is located in an existing building with adjacent occupied spaces so consideration in keeping the facility operating with no disruptions was key to this successful project.

CHEYENNE MOUNTAIN RESORT | INDOOR POOL BUILDING ENCLOSURE

38North Construction Group was selected by Dolce/Wyndham as Project Manager for the Cheyenne Mountain Resort’s Indoor Pool Building Enclosure Project. The project is the replacement of an existing tensile structure that was lost to a wind and hail storm. The project is working through design and development plan process and is scheduled to begin in April 2018 and will be completed by Thanksgiving 2018.

USAFA - FALCON'S NEST

38North Construction Group provided pre-construction services that included schedule development and phasing/logistics planning for the USAFA – Falcon’s Nest Project. The project is the replacement and expansion of the existing press box in Clune Arena - Basketball and Hockey venues. The project is an interior structural remodel with an extremely constrained area. This included working from an existing structure, coordinating design with weights of equipment and construction loads, to a detailed demolition plan in the most safe and cost-effective manner. 38N engaged multiple subcontractors to solicit feedback and develop the means and methods to this very unique and challenging project.

ESCAPE THE PLACE

38North Construction Group and James W. Nakai were selected to be the Design Build team for Escape the Place's new facility located at 1103 N. Circle in Colorado Springs. The project consists of the fit out of 4,990sf of existing shelled space. This includes 9 puzzle rooms, 2 conference rooms, a large 1000sf meeting room for catered events capable of up to 67 occupants, support spaces, reception and new restrooms. The project is underway and scheduled for completion March 5, 2018. We are so excited to be a part of this growing business in Colorado Springs.

UNITED STATES OLYMPIC MUSEUM

38North Construction Group was selected to provide secondary support as a Project Manager/Owner’s Representative for the new United States Olympic Museum in Colorado Springs, Colorado. This project is located on the west side of the downtown area and is the lead project in what hopes to be the kick- off to a new and revitalized Colorado Springs. The project is under construction and is planned to be open in 2019.